SINUS CASCADE UNIT
Manifold/Collecting Pipe with Hydronic Junction Type 200/120
Hot water flow rate: | 34.4 m³/h (151.5 gpm) |
Capacities at ∆ t 15 k: | 600 kW |
product description:
- Manifold/collecting pipe for receiving boiler connections from two superposed profiled pipes, S235 material with welded end caps and 3/4" drain couplings.
- Depending on the type of assembly, there is a hydronic junction firmly connected as a unit with the manifold/collecting pipe on the left or right hand side.
- Hydronic Junction made of S235 square hollow profile with two lateral connecting pieces for connecting to the secondary heating circuits.
- 1/2" couplings for emptying and sensing elements are provided as a standard feature.
- The connection of heating boilers is implemented through rearwards guided 90° pipe elbows.
- Thus all types of boilers and boiler sizes can be installed.
- The Sinus Cascade Unit is factory pressure tested at 6 bar (90 psi) and primed.
- Fixed foot in standard design, 200 mm installation height.
- Application range: operating temperature up to max. 90 °C (194 °F), operating pressure up to max. 4.0 bar (60 psi).
Connections
| | |
| Left hand connection | |
| Hydronic junction, left hand side of manifold | 4 heating boilers |
| with 3" outside thread on secondary side [up to 21.8m³/h (96.0 gpm)] | 5 heating boilers |
| | 6 heating boilers |
| | |
| with flange 4", 150 lps, on secondary side [up to 34.4 m³/h (151.5 gpm)] | 4 heating boilers |
| | 5 heating boilers |
| | 6 heating boilers |
| | |
| Right hand connection | |
| Hydronic junction, right hand side of manifold | 4 heating boilers |
| with 3" outside thread on secondary side [up to 21.8m³/h (96.0 gpm)] | 5 heating boilers |
| | 6 heating boilers |
| | |
| with flange 4", 150 lps, on secondary side [up to 34.4 m³/h (151.5 gpm)] | 4 heating boilers |
| | 5 heating boilers |
| | 6 heating boilers |
| | |
view dimensions drawingtechnical changes accept with reservation
Accessories
Prefabricated insulation
| | |
| for left hand connection | |
| with flange 3", 150 lps, on secondary side | 4 heating boilers |
| | 5 heating boilers |
| | 6 heating boilers |
| | |
| with flange 4", 150 lps, on secondary side | 4 heating boilers |
| | 5 heating boilers |
| | 6 heating boilers |
| | |
| for right hand connection | |
| with flange 3", 150 lps, on secondary side | 4 heating boilers |
| | 5 heating boilers |
| | 6 heating boilers |
| | |
| with flange 4", 150 lps, on secondary side | 4 heating boilers |
| | 5 heating boilers |
| | 6 heating boilers |
| | |
Prefabricated insulation acc. to German Energy Savings Ordinance (EnEV) of 01/10/2009 consisting of two half shells with end pieces and cutouts for all connecting pieces (40 mm PUR foam in a coarse-grain aluminum jacket)
technical changes accept with reservation
Wall bracket
Noise-insulated and zinc-plated, consisting of
a wall plate for screw fastening and a support arm
Boiler Mounting Rack
Special design, rust protected
